At Hemmington in Peterborough, a project included the removal of a 5000-litre single skin plastic tank and the installation of a bespoke 5000-litre steel tank. The specialised nature of the task necessitated the use of a crawler crane for successful execution.
■ EXPERTS SINCE 2003