At Elton in Peterborough, a project involved the removal of two 5000-litre single skin steel tanks and the installation of a single 8000-litre bespoke bunded steel tank. The implementation of a new concrete base was integral to the project, and a 25-tonne crane was required for the successful execution of the project.